Surface preparation installation
From May 2011 to February 2012, NPP TEK participated in the implementation of a project for the production and control of railway wheels for high-speed rail transport under a contract with Maanshan Iron & Steel Company Limited (Maanshan, China).
During the implementation of this project, NPP "TEK" carried out work on:
- design,
- development of design documentation,
- production and delivery
- robotic transport complex (27.4 m long),
- equipment for loading and unloading wheels onto the line, transporting railway wheels between technological installations.
- We also designed and manufactured technological installations for preparing the surface of railway wheels for high-speed locomotives.
- Commissioning of all equipment was carried out.
- Manipulator (fuel and energy complex, Russia)
- Installation of wheel washing (TEK, Russia)
- Hardness control unit (Laizhou Huayin, China)
- Installation of stamp application (China)
- Geometry control installation (Mermec, Italy)
- Ultrasonic testing installation (NDT, Canada)
- Installation of magnetoluminescent control (China)
- Wheel drying plant (fuel and energy complex, Russia)
- Wheel painting installation (TEK, Russia)
- Transport trolleys (fuel and energy complex, Russia)